Terms & Shipping


Topics covered in this section are:


Posting and shipping


All orders received before 12pm are processed and posted the same day, Monday to Friday.  

The following methods of posting are used as standard for the range of transformers:

memonizerCOMBI

memonizerWATER

memonizerPOOL

memonizerCAR

memonizerSOLAR

memonizerWORKSTATION

All of the above delivery methods come with full insurance during transit for loss or damage.  If you would like these items shipped differently, please contact me to arrange this.


Call out fees


Though some customers choose to install the home devices themselves, you can request a home visit to install it for you if you wish.  You may also wish to ask for an assessment of your home situation.  In all cases a call out fee is charged and includes the following:

All prices exclude VAT at 20%.  

If you would like to request an installation or home visit, or a quote for doing so, please contact InHarmony with Nature.


60 day trial


The following transformers come with a 60 day trial offer:

Unfortunately all transformers are not included in this trial offer.

The trial period begins the day after your transformer(s) arrive to you. Under this offer, if you are not satisfied with the transformer(s), you may return for a full refund, with the exception of 7.5% of the purchase value for restocking and testing.

Please note that for this offer to be valid:

For example, you may purchase a transformer that is smaller than the appropriate transformer size your house actually requires, which may not be providing you with the proper level of protection and may also drain or negatively affect the transformers longevity.

  1. memonizerCOMBI - in addition to being installed as per the instructions, your home must have a ‘main isolator switch’, often labelled ‘main switch’. This switch turns off the power to your entire property, not just a part of it. This is essential because it is this switch that forms the boundary point for the memonizerCOMBI's field, and if not present will cause the field to leak out into the mains grid and drain the transformer rapidly.  This will result in damage to the transformer.
  2. memonizerWATER - for correct installation, this transformer simply needs to be fitted as per the instructions.
  1. The relevant transformer(s) will be sent back to memon® for testing.
  2. If the test concludes that the transformer(s) has/have suffered damage and can be repaired, then all shipping any relevant repair costs will be deducted from your remittance.
  3. If the transformer cannot be repaired, this will invalidate your eligibility for the trial offer for the damaged transformer(s) in question, in which case:

Once delivery of the returned transformer(s) is/are received and checked to be in the appropriate condition so as to satisfy the terms of the trial offer (as mentioned above), a remittance cheque will be sent to you for the original device sale value minus 7.5%.